Groundwork
Time-to-power site screen for data-center land — power, gas, water, fiber, county posture. Screening-grade public-data engine. Site Screens leave the firm under NDA with a full disclaimer.
Request a seatAnd we say plainly where it cannot. We identify and control land in the interior West where a data center can be powered on site — ahead of the interconnection queue rather than inside it.
The most valuable feature of a ranch is often the pipeline the owner has been mowing around. Four questions — no email required to see the result, and we will tell you honestly if the answer is no.
One tract matters more than total. A compact block beats a larger scattered holding.
This is the single strongest signal. Select everything that applies.
We work the intermountain and high-plains West.
A well, a spring, a stock pond, or water rights. It need not be potable.
Nothing here is stored or sent anywhere until you choose to send it.
We score counties across the interior West for how quickly power can realistically be delivered there. Ask about yours and we will send the score, the factors, and the sources. No cost, no obligation, and you do not have to be selling.
Ask about your countySend the sites you are already considering and we will run them through the same framework we use for our own account — power deliverability, pipeline and transmission proximity, water, terrain, hazard, and county permitting posture. You keep the analysis. Screening engagements are fixed-scope, priced per shortlist.
Send a shortlistA county-level, dated measure of how quickly load can realistically be energized — published on a regular cadence, with the factors and sources behind every score.
Request your county’s scoreCounty scores, the factors driving them, every source with its date, and the direction of travel since the last update — including counties we score down.
Parcel-level rankings, owner identification, or target lists in any geography where the firm is acting for its own account.
The practice is control of ground where power can be delivered this decade. The moat is the screening method — published as instruments, never as a ranked target list.
Screening-grade · not underwriting
Time-to-power site screen for data-center land — power, gas, water, fiber, county posture. Screening-grade public-data engine. Site Screens leave the firm under NDA with a full disclaimer.
Request a seatOptical / Ka ground-window hours from public ERA5. Demonstrates the method in another vertical. Screening-grade. Not a link budget or SLA.
Robot / humanoid plant screen. Public climate modeled; plant fields operator-curated. Screening-grade. Not underwriting. Not a stamp.
Demo disclaimer. Window and Mill are method demos. Groundwork Site Screens are screening-grade, not underwriting, and are shared under NDA only. Public faces carry their own honesty labels; they carry honesty labels only — screening-grade, not underwriting.
Most sites that look good on a map cannot be energized this decade. The work is separating the two, early, and reaching the owner first.
Identifying campus-scale ground before it is listed. The parcels that matter are rarely on the market, and the largest holding is seldom the right one.
Every candidate scored against a consistent framework: power deliverability, transmission and pipeline proximity, water, terrain, hazard exposure, cost basis, and the demonstrated permitting posture of the county itself.
Public data establishes the shortlist; it does not close the question. Utilization, headroom and interconnection reality come from the operators and the county, by telephone, on the record.
Securing the ground by the instrument that suits the owner and the schedule — purchase, option, or long-term lease. Control is what a developer needs; ownership is only one way to hold it.
The scarce input in data-center development is no longer capital, land, or even megawatts in the abstract. It is a date — the day a site can actually take load. Almost every other variable is negotiable. That one is not, and it is set years before anyone breaks ground.
Large loads seeking a conventional grid connection in most of the United States join a queue measured in years. The consequence is a widening gap between two things that look identical on a parcel map: ground that is near power, and ground that can be energized. The first is abundant and cheap. The second is scarce and almost never priced correctly, because the people selling land price it as land.
Behind-the-meter generation — gas, geothermal, solar, or a combination — does not make power cheaper. Frequently it makes it more expensive per megawatt-hour. What it does is take the schedule out of someone else’s hands. For a developer whose model depends on a commercial operation date, paying a premium per megawatt-hour to remove multi-year schedule risk is not a concession. It is the entire transaction.
This is not theoretical. Counties in the interior West have already approved integrated developments pairing a data-center campus with dedicated on-site generation and non-potable water supply, and have sustained those approvals through resident appeal. The template exists. What is scarce is ground where it can be executed.
Three frictions. First, the information is hard to assemble: pipeline capacity, interconnection posture and county political appetite live in different places, in different formats, and much of it is not published at all. Second, the parties holding the best ground — multi-generational ranch holdings, absentee owners, family trusts — are not listing it and are not reading data-center trade press. Third, and most underrated, the binding constraints are frequently political rather than physical. A county with excellent physical characteristics and a hostile electorate is not a site. That fact is invisible on every map product on the market.
That last item is the honest state of the field. When an interstate pipeline operator’s own presentation to a state legislature leaves a question mark where a capacity number belongs, no dataset on the market contains that number either. It is obtained by telephone or it is not obtained.
If time-to-power is the binding constraint, the correct unit of analysis is neither the parcel nor the county. It is the convergence — ground where a fuel source, a transmission path, adequate non-potable water, tolerable terrain, and a county that has demonstrably said yes all occur in the same place. Those convergences are rare, identifiable in advance, and currently owned by people who do not know what they have.
Much of the data required to price these sites is modeled, not measured. Our instruments stay screening-grade, not underwriting. Pipeline utilization is inferred from public filings and operator testimony rather than metered. County posture is a judgment formed from ordinances, ballot outcomes and permit decisions — evidence, not a number. Any framework reporting these with false precision, or quietly omitting a factor it could not resolve, is producing confidence rather than information.
Our practice is to label modeled inputs as modeled, to state the source and date of every material figure, and to refuse to produce a verdict where too much of the evidence is missing. A screen that declines to answer is more useful than one that guesses well.
Plain answers to the questions we are asked most often. Nothing here obliges you to anything.
Origination in this market rewards speed, direct contact with owners, and a willingness to be wrong quickly and in writing — none of which survive a committee. The person who evaluates a site is the person who answers the phone.
Groundwork is in private beta. Name, company, role, and one line — no public mailbox on this page. Screening-grade, not underwriting. Site Screens under NDA only.
Ask what your county scored. No cost, no obligation, and you do not have to be selling.
Send a shortlist to be screened, or inquire about licensing the framework and county intelligence.